When the clients first walked into their small, outdated bathroom, they handed us a clear challenge: a $29K budget and just three weeks. We began by stripping out the wood paneling and old fixtures, then updated the plumbing and prepped all surfaces. With walls ready, we sketched the new layout and lined up materials to keep the work moving smoothly.
Next, we set the frameless glass shower, laid the blue tile, built a storage niche, and installed the vanity with its hardware. Every fitting was tested, seals checked, and pipes inspected. After a quick cleanup, we handed over an open, functional bathroom right on time and within budget—and the clients couldn’t have been happier with the result.